Engineering the Treatment. Supporting the Field. Measuring the Result.
NanoWell Pro combines well assessment, treatment design, deployment support, monitoring, and maintenance planning in one service-led operating model.
Request a Well AssessmentExplore ServicesProduction history, pressure, temperature, depth and operating constraints become the basis of the treatment.
Start with the well—not the product
Every engagement begins by understanding production history, fluids, API gravity, depth, pressure, temperature, completion, lift system, recent treatments, and the operator’s objective.
Volume, concentration, injection pressure and shut-in parameters are adapted to the specific candidate.
Translate operating data into a field program
NanoFlow treatment volume, deployment method, shut-in, restart, monitoring, and maintenance are engineered for the candidate well. Conservative scenarios replace generic production promises.
Technology supports the program. Service discipline makes it operational.
One accountable path from well data to final report
Data Intake
Production, fluids, pressure, temperature, lift, and treatment history.
Screening
Technical fit, baseline quality, constraints, and practical risks.
Design & Forecast
Well-specific treatment and conservative response scenarios.
Mobilization
Product, equipment, site, safety, and operator coordination.
Injection Support
On-site execution or supervision of the operator team.
Shut-In & Restart
Planned 24–48 hour shut-in and controlled restart.
Monitoring
Track production and operating response; optimize from data.
Maintenance & Report
Review dosing needs and issue the performance report.
Mobilization, injection support, restart coordination and operator communication stay connected.
Four technologies supporting distinct service needs
NanoFlow® supports production programs. NanoHealer® NS supports environmental recovery. NanoDegreaser® NS supports industrial cleaning. NanoShield® NS supports surface microbial, mold, and fungal control under applicable test conditions.
Production response is reviewed against baseline data to guide maintenance and optimization decisions.
30 to 79.9 BOPD on the first day
One anonymous Latin American field trial reported an increase from 30 to 79.9 BOPD—approximately 166% on the first day after treatment.
This is one documented observation, not a guaranteed outcome. Field conditions can materially change results.